Chips can be imported, knowledge should not

August 5, 2026

The arrival of NVIDIA chips in Sines has exposed a contradiction Portugal shouldn’t ignore.

In the first quarter of 2026, investment in machinery and equipment surged. So did imports. According to a Bank of Portugal analysis cited in the press, much of that movement came from data-processing equipment destined for the new capacity installed in Sines.

The investment appeared in the statistics but since almost all the equipment was imported, the value added created immediately in Portugal was limited. This is not an argument against data centers but a heads-up about the kind of economy we want to build around them.

The AI race is real, and Portugal has good reasons to take part. We have an Atlantic location, submarine cables, industrial land, renewable generation capacity and the ability to connect Europe, Africa and the Americas.

That advantage became more tangible on 21 July, when Google's Nuvem submarine cable was landed in Sines in partnership with MEO. Almost 6900km long, the system will connect Myrtle Beach to Sines, via São Miguel and Bermuda, and is expected to enter service in 2027.

The new route strengthens transatlantic links and makes Sines more appealing for data centers, cloud services and AI. Still, the same logic applies, infrastructure opens a door, but it does not guarantee that knowledge, services and companies will grow in Portugal.

The National Data Centre Plan (Plano Nacional de Centros de Dados) estimates that demand in Portugal could grow from 0.2 GW in 2025 to around 1 GW by 2030. Compared to Sines, Start Campus plans a six-building campus with 1.2 GW of capacity and €8.5 billion in investment.

It would be a mistake to let this opportunity pass. It would be an equally serious mistake to confuse building data centers with building a digital economy.

A country can receive buildings, servers and investment without capturing the knowledge that gives them value. It can provide the land, electricity and grid connection while the equipment, specialist engineering, intellectual property, cloud services, management teams and profits remain abroad.

In that scenario, Portugal doesn’t grow as a technology hub but as a landlord of foreign technology infrastructure.

The energy question cannot be treated as an awkward detail either. If the 1.2 GW of IT capacity planned for the Sines campus ran continuously and the complex achieved the PUE of 1.1 announced by the developer, total consumption would be around 11.6 TWh per year. That is equivalent to approximately 22% of the electricity consumption recorded by REN in 2025.

Estimated Sines Campus capacity compared with REN’s 2025 electricity consumption.

The campus does not yet operate at that scale and may never run entirely at full load but the order of magnitude is enough to show that this is an industrial and energy policy decision, not just another property development.

Who should pay to reinforce the grid? What new renewable generation and storage capacity will accompany these projects? How do we stop the costs from being passed on to households and businesses? What demand-flexibility mechanisms will operators have to provide? And what value will remain in Portugal in return for that electricity capacity?

I’m not against foreign investment, in fact I’m in favor of it, but questions like these need to be answer in order to define the economic and social contract that come with this opportunity. The government itself estimates that every additional gigawatt could create around 3,300 direct jobs in operations. It is an ambitious forecast, based on a McKinsey analysis whose assumptions are not explained in enough detail in the published plan. Before repeating the figure as a certainty, we need to know what the jobs are, where they will be based, what qualifications they require and how many can be filled by people trained in Portugal.

This is where talent policy should come in.

Portugal is not starting from scratch, in 2025, it had around 284,000 ICT specialists, accounting for 5.4% of total employment and slightly above the European average. ICT is also among the best-paid fields in the country.

At the same time, we remain well short of the European target of ICT specialists accounting for 10% of employment by 2030. And some of the talent we train leaves: among the 2016/2017 graduates covered by Eurograduate, 8% of bachelor's graduates and 13% of master's graduates said they had moved abroad.

Portugal trains people who then help build other countries' economies. Now that technology investment is arriving, shouldn't we create the conditions to bring them back?

Foreign talent will remain necessary and welcome. No country can build a new industry quickly using only the resources it already has. International specialists can accelerate projects, bring experience and transfer knowledge.

But importing talent cannot replace training people in Portugal, it should complement it.

The National Data Center Plan already recognizes part of this problem. It calls for a map of Portuguese suppliers, benefits for local communities, and the creation of academic and technology hubs. What is missing is a set of measurable commitments.

Why not require a skills plan whenever a project benefits from public land, accelerated planning approval, special grid reinforcement or any other form of state support?

That plan could identify, five years in advance, the operational roles that will be needed: electrical and mechanical technicians, specialists in cooling, automation, BMS and EPMS, networks, cybersecurity, energy, cloud systems and AI infrastructure.

It could also fund technical academies in Sines, Setúbal and Alentejo, working with polytechnics, universities, and the IEFP. The model already exists in other countries. Major hyperscalers, for example, runs academies linked to its data center, with industry-aligned curricula, simulation labs, scholarships, mentoring and work experience.

Portugal can adapt that model. It can also use UPskill, which already connects training to specific business needs and requires employers to hire at least 80% of the trainees they request.

Why not create a branch of UPskill dedicated to the physical and digital infrastructure of data centers? Why not establish short-cycle technical degree programs with paid placements inside these projects? Why not create return grants for Portuguese engineers with international experience? Why not reserve computing capacity for Portuguese universities, research centers and startups?

We also need to measure actual results. How many permanent jobs were created per megawatt installed? What is the average pay? How many workers were trained in Portugal? How much was spent on training? What share of contracts was won by Portuguese suppliers? How many research projects, patents, cloud services and artificial intelligence companies emerged around this infrastructure?

Success cannot be measured only in gigawatts and billions of euros announced.

Portugal will not start manufacturing the world's most advanced processors overnight. But it can train the people who install, operate, protect and use them. It can develop software, energy-efficiency systems, cooling, cybersecurity, cloud services and artificial intelligence applications. It can turn foreign investment into national capability.

The chips can be imported, the knowledge does not have to be.

The data center race will only truly be won when Portugal stops being just the place where the machines are installed and becomes the country where the people are trained, the companies are created and the technologies that give those machines value are developed as well.